800-215-5541
Mon–Fri 6:30am–5pm · Sat 8am–3pm
800-215-5541
Mon–Fri 6:30am–5pm
Mission Critical
Generators, transfer switches, emergency lighting and the distribution behind them, for facilities that can’t go dark. Excel supplies contractors and facility teams across Metro Detroit from our Warren and Waterford Township branches.
Emergency systems back on
Within 10 seconds.
Press play, or step through each moment to see what the equipment is doing and what we supply for it.
Site statusT + 0 s
0 s
Power from the utility is gone. Loads on a UPS keep running from its batteries without a break, and the transfer switches signal the generator to start.
What we supply here
Site statusT + ≤ 10 s
≤ 10 s
The NEC gives emergency systems 10 seconds. The generator comes up to speed and the emergency transfer switch picks up egress lighting, fire alarm and other life safety loads.
What we supply here
Site statusT + ≤ 60 s
≤ 60 s
Loads required by code or the authority having jurisdiction, such as some ventilation, smoke removal and communications systems, must be back within 60 seconds.
What we supply here
Site statusT + + Optional
+ Optional
Optional standby loads that protect the operation come back next, often through load-shed controls so the generator isn’t overloaded.
What we supply here
Site statusT + Hours
Hours
The site runs on the generator for as long as the fuel and the design allow, while the UPS stays charged and ready for the next transfer.
What we supply here
Site statusT + Utility back
Utility back
Once the utility is stable, the transfer switches return to normal after an adjustable time delay, and the generator runs a cool-down cycle before it stops.
What we supply here
Example sequence for illustration. Timing and load assignments come from your engineer’s design and the NEC.
Mission-critical designs add capacity so one failure doesn’t take the site down. Here’s what the shorthand on your drawings means.
Exactly the capacity the load needs. If one unit is down, the load isn’t fully covered.
One extra unit, so any single unit can fail or be down for service without dropping the load.
Two complete, independent systems, each able to carry the full load on its own.
When a part fails at 2 AM, the spare in your stockroom beats any delivery. Send your list and we’ll quote it.
Mission-critical facilities we supply
In the NEC, emergency systems (Article 700) serve life safety loads and must be restored within 10 seconds. Legally required standby systems (Article 701) serve loads required by code or the authority having jurisdiction, such as some ventilation, smoke removal and communications, within 60 seconds. Optional standby systems (Article 702) protect property and operations. Your engineer decides which loads go on which system.
Yes. Send the kW rating, fuel type, voltage and phase, plus the transfer switch amperage, poles, transition type and whether it’s service-entrance rated, and we’ll quote the generator, ATS and accessories to your spec.
Yes. Upload your list of part numbers or nameplate photos, and we’ll quote the fuses, breakers, contactors, batteries and other spares you want on the shelf.
We supply the breakers, disconnects, cable and battery components around UPS installations. Ask about UPS equipment for your project and we’ll let you know what we can quote.
No. Excel is an electrical supply house. Installation, testing and maintenance of emergency and standby systems are handled by your contractor or service provider.
See our Data Centers and Healthcare Facilities pages for those projects.
Upload your plans or material list, then add your contact details.
PDF, DWG, XLS, DOC, JPG or PNG · up to 100 MB each
Files selected. They’ll be uploaded when you send your request after adding your details.
Add your contact details and what you need quoted.
Keep this reference if you contact us about your request.
Added to cart